Published Papers
TITLE:

Tercon Contractors Ltd. v. British Columbia (Ministry of Transportation and Highways) (Case Comment)

PRESENTED / PREPARED BY:

Markus Rotterdam

OTHER NOTES:

Nuts & Bolts, Volume 24, No. 3, p. 2


TITLE:

Expert Determination

PRESENTED / PREPARED BY:

Duncan W. Glaholt

OTHER NOTES:

(2009), 82 C.L.R. (3d) 12


TITLE:

Conciliation

PRESENTED / PREPARED BY:

Duncan W. Glaholt

OTHER NOTES:

(2009), 82 C.L.R. (3d) 161


TITLE:

When is a General Lien Just an Excessive Lien?

PRESENTED / PREPARED BY:

Charles Wiebe

OTHER NOTES:

(December 2009) 24:2 Nuts & Bolts 2


TITLE:

Constructing Protection for Design Professionals: Architects’, Engineers’ Liability to Third Party Contractors

PRESENTED / PREPARED BY:

Andrea Lee

OTHER NOTES:

(July 2009) Building Strategies 11


TITLE:

Standard Form Architectural Contracts

PRESENTED / PREPARED BY:

Andrea Lee

OTHER NOTES:

(Summer/Fall 2009) Architecture 41


TITLE:

Indoor Mould Litigation in Canada

PRESENTED / PREPARED BY:

Andrea Lee

OTHER NOTES:

(2008) 23:1 Nuts & Bolts 2


TITLE:

Copyright in Architectural Works

PRESENTED / PREPARED BY:

Andrea Lee

OTHER NOTES:

(2008) 23:1 Nuts & Bolts 4


TITLE:

Lienable Off-Site Supply

PRESENTED / PREPARED BY:

Soizic Reynal de St Michel

OTHER NOTES:

(May 2009) Building Strategies


TITLE:

Is It Time to Acknowledge Interior Designers' Lien Rights?

PRESENTED / PREPARED BY:

Andrea Lee

OTHER NOTES:

(Summer 2007) Building Strategies


TITLE:

Copyright in Architectural Works

PRESENTED / PREPARED BY:

Andrea Lee

OTHER NOTES:

(Winter 2007/2008) Building Strategies


TITLE:

No Intent, No Lien, No Problem?

PRESENTED / PREPARED BY:

Keith A. Bannon

OTHER NOTES:

(Fall 2008) Building Strategies 12


TITLE:

Foreseeable Dissent: A Review of Canadian National Railway Co. vs. Royal and SunAlliance Insurance Co. of Canada

PRESENTED / PREPARED BY:

Lawlor Rochester

OTHER NOTES:

Published: (2008), 73 C.L.R. (3d) 168


TITLE:

The New CCDC 2 Stipulated Price Contract 2008

PRESENTED / PREPARED BY:

by Keith A. Bannon

OTHER NOTES:

Building Strategies, Spring 2008.


TITLE:

Protecting Your Rights Through Registered Fixture Interests

PRESENTED / PREPARED BY:

by Duncan W. Glaholt

OTHER NOTES:

Building Strategies 16, Fall 2007.


TITLE:

Has the Time Come for the ‘100 Day Construction Arbitration’ in Canada?

AUTHOR:

by Duncan W. Glaholt

OTHER NOTES:

Citation: (2007), 59 C.L.R. (3d) 1


TITLE:

The Adjudication Option: The Case for Uniform Payment & Performance Legislation in Canada

AUTHOR:

by Duncan W. Glaholt

OTHER NOTES:

Citation: (2007), 53 C.L.R. (3d) 8


TITLE:

Liening Work for Tenants

AUTHOR:

by Duncan W. Glaholt

OTHER NOTES:

(Spring 2007) Building Strategies 13


TITLE:

Handling Hot Commodity Prices

AUTHOR:

by Duncan W. Glaholt

OTHER NOTES:

Building Strategies, Spring 2006.


TITLE:

Adjudication: The Next Big Deal!

AUTHOR:

by Duncan W. Glaholt

OTHER NOTES:

Building Strategies, Spring 2006.


TITLE:

Veltri Metal Products Co. (Re): The Death of Minneapolis-Honeywell?

AUTHOR:

Case Comment by Duncan W. Glaholt

OTHER NOTES:

(2006) 48 C.L.R. (3d) 171



TITLE:

Two Court of Appeal Decisions Clarify Law of Tendering in Ontario

AUTHORS:

Brendan Bowles and Markus Rotterdam, Glaholt LLP

OTHER NOTES:

Nuts & Bolts, September 2005



TITLE:

KENNEDY ELECTRIC LTD. V. RUMBLE AUTOMATION INC. –  A Case Comment by Charles G.T. Wiebe and Markus Rotterdam, Glaholt LLP

AUTHORS:

Charles G.T. Wiebe and Markus Rotterdam

OTHER NOTES:

Ontario Electrical Contractor, Vol. 43, No. 2, Spring 2005



TITLE:

Buying Free of Lien Claims – The Home Buyer Provisions of the Construction Lien Act

AUTHORS:

Duncan W. Glaholt & Markus Rotterdam

OTHER NOTES:

(2004), 27 C.L.R. (3d) 16




TITLE:

Material Price Increase

AUTHORS:

Charles Wiebe & Markus Rotterdam

OTHER NOTES:

Ontario Electrical Contractor, Vol. 42, No. 4, Fall 2004.




TITLE:

Ounce of prevention goes long way in electronic registration of liens

AUTHOR:

Rosa L. Mauro

OTHER NOTES:

Daily Commercial News , Tuesday, August 10, 2004




TITLE:

INSTALLATION OF WINDOW BLINDS DOES NOT QUALIFY AS AN IMPROVEMENT UNDER THE CONSTRUCTION LIEN ACT

AUTHOR:

Brendan D. Bowles

OTHER NOTES:

Published in Ontario Bar Association Construction Law Section Newsletter, Nuts & Bolts, Volume 18, Issue No. 3, March 2004)




TITLE:

Exclusion and Limitation Clauses – Part 1

AUTHORS:

Duncan W. Glaholt & Markus Rotterdam

OTHER NOTES:

Construction Canada , November, 2003




TITLE:

Exclusion and Limitation Clauses – Part 2

AUTHORS:

Duncan W. Glaholt & Julia Falevich

OTHER NOTES:

Construction Canada , January, 2004




TITLE:

Managing Trust Funds - The New York Model

AUTHORS:

Duncan W. Glaholt & Markus Rotterdam

OTHER NOTES:

(2003), 21 C.L.R. (3d) 74




TITLE: "Registering a Lien Where the Project Does not Proceed"
AUTHOR: Brendan D. Bowles © 2003
OTHER NOTES:

(Published in Construction Law Update News Bulletin, Volume 2, Issue 46, January 2003)




TITLE: Deconstructing Construction Liens
AUTHOR: Duncan W. Glaholt & Markus Rotterdam
OTHER NOTES:

Law Society of Upper Canada Special Lectures 2002:

Real Property Law: Conquering the Complexities

( Toronto: Law Society of Upper Canada, 2002)




TITLE: An ICC Model for the Resolution of Complex Construction Disputes
AUTHORS:

Duncan W. Glaholt & Markus Rotterdam

 

OTHER NOTES:

(2002), 14 C.L.R. (3d) 173




TITLE: The Defences to Breach of Trust Actions: We Spent all the Money
AUTHORS:

Duncan W. Glaholt & Markus Rotterdam

 

OTHER NOTES:

(2002), 10 C.L.R. (3d) 262




TITLE:

Case Comment: Toro Aluminum Ltd. v. Revah

AUTHORS:

Duncan W. Glaholt & Markus Rotterdam

 

OTHER NOTES:

(2000), 3 C.L.R. (3d) 16




TITLE:

Professional Engineers: Does a Higher Risk Imply a Higher Standard of Care?

AUTHOR:

Lawlor Rochester

 

OTHER NOTES:

(2000), 50 C.L.R. (2d) 199




TITLE:

Can We Afford Edgeworth?

AUTHOR:

Lawlor Rochester

 

OTHER NOTES:

(2000), 50 C.L.R. (2d) 277




TITLE:

Breach of Trust – Are You Exposed?

AUTHORS:

Duncan W. Glaholt & Markus Rotterdam

 

OTHER NOTES:

(2000), 49 C.L.R. (2d) 228




TITLE:

Overhead Payments Out of Statutory Trust Monies

AUTHORS:

Duncan W. Glaholt & Markus Rotterdam

 

OTHER NOTES:

(2000), 49 C.L.R. (2d) 36




TITLE:

Can the Trusts Established by the Construction Lien Act Survive a Bankruptcy?

AUTHOR:

Charles G. T. Wiebe

 

OTHER NOTES:

(1999), 44 C.L.R. (2d) 156




TITLE:

Toward an Inquisitorial Model for the Resolution of Complex Construction Disputes

AUTHORS:

Duncan W. Glaholt & Markus Rotterdam

 

OTHER NOTES:

(1998), 36 C.L.R. (2d) 159




TITLE: Engineering Firm Loses One Year Limitation Period Protection
AUTHOR:

Lawlor Rochester

 

OTHER NOTES:

(1996), 29 C.L.R. (2d) 212




TITLE: Third Party Liability of Professional Engineers
AUTHOR:

Lawlor Rochester

 

OTHER NOTES:

(1995), 21 C.L.R. (3d) 190




TITLE: Sections 37 & 46: An Overdose of Remedy
AUTHORS:

Duncan W. Glaholt & John Margie

 

OTHER NOTES:

(1994), 13 C.L.R. (2d) 6




TITLE: Non-Pecuniary Damages for Breach of a Construction Contract
AUTHOR:

Lawlor Rochester

 

OTHER NOTES:

(1985), 13 C.L.R. 63

 
 
 
141 Adelaide Street West Suite 800, Toronto, Ontario, M5H 3L5 Tel: (416) 368-8280 Fax: (416) 368-3467
 
Copyright – Glaholt LLP All Rights Reserved